Fulton County’s population was approximately 590,000 in 1980, and this has doubled to more than 1.08 million over the last 45 years. Multiple sanitary sewer pump stations were designed and constructed between 1980 and 1985 to service different parts of the County in anticipation of this growth. The wastewater pump stations discussed in this presentation have reached the end of their operational life, and were upgraded to improve operational performance, and in some cases capacity of the station. I will discuss the challenges of evaluating the existing stations, determining current and future capacity requirements, and how the design was determined to retrofit the stations. Challenges during construction will be discussed; intake and wet well conditions once cleaned, existing intake pipe and force main conditions, site and electrical complications. The result was to determine if the pump station should be retrofitted or ultimately replaced with an entirely new station, and in some cases a temporary fix was the best solution until a new station could be constructed.
The presentation will also touch on the need for new pump stations in portions of the County that currently have no public sewer access and the challenges for locating the stations, easements and property acquisition, and environmental impacts.
Presented by:
Kalyn Keeney, PE, is a principal engineer at Stratus with 23 years of experience in designing and preparing construction documents for water, sewer, and stormwater infrastructure. Based in Atlanta, Georgia, she serves as senior engineer for Stratus’ Water Resources group. Kalyn’s expertise includes both utility and civil site design, and construction management. For the Graham Drive Pump Station Project , Mrs. Keeney served as the Engineer of Record for the pump station rehabilitation design and civil site portion of the project.
Kalyn will present at 9:20 AM for PDH Day. Registration is available: https://gspe.org/pdh-day/